Skip to content
lifestyle.successfuldaily.com
Animals
Auto
Beauty & Style
Business News
Entertainment
Food
Health
Home & Family
Podcasts
Tech
Travel
Author:
Aztec Minerals Corp.
Aztec Drills 88.4 meters of 1.42 g/t Au and 14.58 g/t Ag (1.69 g/t AuEq) in First North Extension Step-Out Drilling at the Tombstone Project, Arizona
August 5, 2026
Aztec Drills 1.08 gpt Au and 30.23 gpt Ag (1.63 gpt AuEq) over 155.4 meters, Expands Oxide Gold-Silver Zone at Tombstone Project, Arizona
July 15, 2026
Aztec Engages Kappes, Cassiday & Associates to Advance Metallurgical Testing of Oxide Gold-Silver Mineralization at Tombstone
July 2, 2026
Aztec Minerals Increases Tombstone Drilling Program by 3,500 Meters
May 28, 2026
Aztec Drilling Expands Oxide Gold-Silver Zone Step Outs at Tombstone; intersecting 2.31 gpt Au and 43.23 gpt Ag over 27.4 m within 66.9 m of 1.05 gpt Au and 23.21 gpt Ag
May 23, 2026
Aztec Minerals Engages APEX Geoscience Ltd. to Commence Maiden Mineral Resource Estimates on the Tombstone and Cervantes Projects
May 20, 2026
Aztec Drilling Expands Oxide Gold-Silver Zone at Tombstone Project, Arizona; intersecting 0.62 gpt Au and 24.8 gpt Ag over 107.9m in Westside Area and 0.48 gpt Au and 12.6 gpt Ag over 112.5m at Contention Area
April 16, 2026
Aztec Drilling Expands Oxide Gold-Silver Zone at Tombstone Project, Arizona; intersecting 0.62 gpt Au and 24.8 gpt Ag over 107.9m in Westside Area and 0.48 gpt Au and 12.6 gpt Ag over 112.5m at Contention Area
April 15, 2026
Aztec Minerals Increases Drilling Program by 4,500 Meters and Commences Downhole Geophysical Survey of Core Holes at Tombstone Project, Arizona
March 10, 2026
Aztec Drills Oxide Gold & Silver in the Westside Area of the Tombstone Project, Arizona; Intersecting 44.1m of 0.86gpt AuEq (0.22 gpt Au and 44.6 gpt Ag) as Part of a 250m Step Out; And has Joined the Contention and Westside Areas
March 2, 2026